BF single flange limit expansion joint is a combination of loose sleeve expansion joint and a limit short pipe.
The main structure size of BF single flange limit expansion JOINT unit:mm
The main technical parameters of BF single flange limit expansion joint
Design standard: GB/T12465-2007;
Flange standard: GB/T17241 equivalent (EN1092);
Working pressure: 0.6MPa/1.0MPa/1. 6MPA
Applicable medium: various water quality or other oil, air, gas and other media.
Applicable temperature: EPDM O-80℃
Material of main parts of BF single flange limit expansion joint
Valve body: ductile iron.
Telescopic tube: ductile iron
Gland ring: ductile iron
Sealing ring: NBR/EPDM
Fastening bolt: stainless steel
BF single flange limit expansion joint is a combination of loose sleeve expansion joint and a limit short pipe. Single flange loose sleeve limit expansion joints are used to connect one side to the flange and the other side to be welded to the pipeline. During installation, adjust the installation length between the two ends of the product and the pipeline or flange. Tighten the gland bolts diagonally, and then adjust the limit. Nuts, so that the pipeline can be freely expanded and contracted within the range of expansion and contraction, and the expansion and contraction can be locked, and the pipeline can operate safely.
1. If the customer has special requirements for the product, the following instructions must be provided in the order contract:
(a).Structure length; (b) Connection Type; (c) Nominal diameter;
(d) Product use medium and temperature and pressure range;
(e) Test, inspection standards and other requirements.
2. Our factory can assemble various driving devices according to customer requirements.
3. If the customer needs to customize a special valve, the meaning and requirements of the model should be correctly explained, and the contract should be signed under the conditions that the supplier and the buyer understand the same.
4. For futures and order customers, please call us and tell us the required valve model, specification, quantity, delivery time and location in detail. And prepay 50% of the total contract amount for the preparation of production materials.