P41X-10 Quick Inlet and Exhaust Valve is suitable for pipelines where the working medium is water to improve the efficiency of water delivery equipment and protect the pipelines from deformation and cracking. The quick exhaust valve is used to exhaust the pressure conveying water pipeline.
Main structure size of P41X-10 Quick Inlet and Exhaust Valve unit:mm
The main technical parameters of P41X-10 quick exhaust valve
Nominal pressure: 1.0MPa
Applicable medium: clean water
Working temperature: 0℃-80℃
Material of main parts
Valve body HT200
Float: stainless steel
The P41X-10 quick exhaust valve is suitable for pipelines where the working medium is water to improve the efficiency of water transportation equipment and protect the pipeline from deformation and cracking. The P41X-10 quick exhaust valve is a necessary equipment for pipelines. The quick exhaust valve is used to exhaust the pressure conveying water pipeline.
Features of P41X-10 Quick Inlet and Exhaust Valve
It can eliminate the gas in the pipeline, feed resistance and save energy.
The exhaust capacity is many times that of the ordinary two-port exhaust valve.
When the pipeline is under negative pressure, this product can quickly and automatically inhale to prevent the pipeline from rupturing.
The floating ball is made of stainless steel, which has a long service life and is safe and reliable.
1. If the customer has special requirements for the product, the following instructions must be provided in the order contract:
(a).Structure length; (b) Connection Type; (c) Nominal diameter;
(d) Product use medium and temperature and pressure range;
(e) Test, inspection standards and other requirements.
2. Our factory can assemble various driving devices according to customer requirements.
3. If the customer needs to customize a special valve, the meaning and requirements of the model should be correctly explained, and the contract should be signed under the conditions that the supplier and the buyer understand the same.
4. For futures and order customers, please call us and tell us the required valve model, specification, quantity, delivery time and location in detail. And prepay 50% of the total contract amount for the preparation of production materials.