FX-H44T/H-10/16 swing check valve is also called one-way valve or check valve, its function is to prevent the medium in the pipeline from flowing back. FX-H44T/H-10/16 swing check valve that opens or closes on its own by the flow and force of the medium to prevent the medium from flowing back is called a check valve.
The main technical parameters of FX-H44T/H-10/16 swing Check Valve
Pressure test standard: GB/T13927
Nominal pressure: 1.0/1.6MPa
Applicable medium: water, oil, acid, etc.
Working temperature: rubber 0℃-80℃
Copper 0℃-120℃
Material of main parts
Body and Bonnet: Ductile Iron
Disc: Ductile Iron
Sealing: rubber/copper/stainless steel
Rocker: ductile iron/carbon steel
Pin shaft: stainless steel
FX-H44T/H-10/16 swing check valve adopts a built-in rocker swing structure. All the opening and closing parts of FX-H44T/H-10/16 swing check valves are installed inside the valve body, and do not penetrate the valve body. Except for the sealing gasket and sealing ring at the middle flange, the whole There is no leakage point, preventing the possibility of valve leakage. The swing arm of the swing check valve adopts a spherical connection structure at the connection between the rocker arm and the valve flap, so that the valve flap has a certain degree of freedom within the range of 360 degrees, and there is an appropriate trace position Compensation.
Suitable for clean medium, not suitable for medium containing solid particles and high viscosity
1. If the customer has special requirements for the product, the following instructions must be provided in the order contract:
(a).Structure length; (b) Connection Type; (c) Nominal diameter;
(d) Product use medium and temperature and pressure range;
(e) Test, inspection standards and other requirements.
2. Our factory can assemble various driving devices according to customer requirements.
3. If the customer needs to customize a special valve, the meaning and requirements of the model should be correctly explained, and the contract should be signed under the conditions that the supplier and the buyer understand the same.
4. For futures and order customers, please call us and tell us the required valve model, specification, quantity, delivery time and location in detail. And prepay 50% of the total contract amount for the preparation of production materials.